Napier Boys' High School Developments
Project 1: Entranceway Enhancement – enlargement
|
Outcomes:
- Increased student safety associated with larger drop off zone.
- Increased bus and car parking.
- Enhanced site drainage.
- Increased site security.
- Enhanced roadside presentation.
Approximate Cost: $300,000 Completion: End of Term III 2009
|
|
 |
Project 2: Art Room(s) Replacement
|
Outcomes:
- Two purpose built Art and Design rooms.
- An ICT design centre
- Increased resource and storage facilities
- Art display area.
- Staff work space.
Approximate Cost: $630,000 Completion: End of Term IV 2009 |
|
 |
Project 3: F Block Replacement
(Involves the temporary location of six prefabricated classrooms on site for twelve months.)
|
Outcomes:
- A purpose built social Science Centre
- Six modern classrooms
- An Information Hub
- Increased quality storage
- Display Foyer
- Staff facilities – Meeting room, Office space
- Multi media room
Approximate Cost: Approx $1,500,000 Completion: End of Term III 2010 |
|
 |
Other recent property developments include:
- Development of vineyard
- The complete refurbishment of computer suites (3) and pods(3)
- Networking of the entire school and hostel sites
- The complete refurbishment of four science labs
- A major swimming pool upgrade.
- Hall extension and redevelopment
- Cuisine suite construction
- Pavilion extension and upgrade
- Technology Block(8 rooms) redevelopment and upgrade
- Construction of turf complex